Understand before you size

Power quality in plain language

These concepts appear in Dicel technical bulletins, tools and reports. They are worth understanding before you specify a filter.

Linear load

Current proportional to voltage

Under steady-state conditions, the waveform remains essentially sinusoidal. Power factor correction with capacitors is usually sufficient — provided there is no resonance.

  • Heating resistors
  • Stable induction motors
  • No-load transformers
  • Incandescent lamps
Nonlinear load

Rectifies, switches or modulates current

Generates harmonics and distorts the waveform. Capacitors alone can worsen THD through resonance — measurement, detuning or filters are required.

  • Variable-frequency drives
  • Induction furnaces
  • LED lighting, UPS, power supplies
  • PV inverters
THD
Total Harmonic Distortion

Expresses as a percentage how distorted current or voltage is relative to the sine wave. Higher THD means greater heating in cables and equipment.

K-Factor
Transformer derating

Indicates how much a transformer can be loaded with distorted currents. A transformer undersized for harmonics overheats and loses service life.

CIGE
Internal Energy Management Committee

An in-house team that tracks energy consumption, demand and power quality. Dicel supports its implementation, measurements and action plans.

Where the problem shows up

The problem shows up in different ways

In industry the problem is often visible and urgent. In distributed generation, time-of-use tariffs and homes with heavy electronics, it can be silent — but equally costly.

Industry — visible problem

When equipment has already signaled a problem

The substation trips when an induction furnace starts. Capacitors fail. Transformers overheat. Protection operates with no clear explanation for operations.

  • Unplanned downtime with immediate cost
  • THD and inrush measurable with Class A instruments
  • Solution: measurement → sized filter → IEEE/PRODIST compliance
DG & residential — silent problem

When the bill looks normal but energy is lost as heat

Solar, time-of-use tariffs, inverters, LED and chargers distort current. Reactive power may not appear on the meter — yet harmonics circulate and heat wiring and electronics.

  • kWh paid that become thermal loss (I²R), not useful work
  • Reduced service life of drivers, UPS and equipment
  • Measure before sizing — Dicel diagnostics
Free Tools

7 technical calculators for engineers — no spreadsheets, no guesswork

Size capacitors, check IEEE 519, estimate UFER penalties and build your RISE checklist. For nonlinear loads, use the tools together with measurement — capacitors alone can increase THD.

Open all tools →

Free assessment for your facility

Leave your contact and a Dicel engineer will review your case — power factor, harmonics or RISE.

L
C
R
Inductor · Capacitor · Resistor
Dicel Engenharia
1982Founded by Darcy Casa
About Us

Over four decades in power quality

Founded in 1982 and focused on Electrical Engineering since 1988, Dicel has been part of Grupo Singel since 2021. It designs filters, measures with Class A instruments and provides power quality consulting.

Full history and clients →
Products

Product lines

Six product lines for power quality, each with photos, specifications and technical bulletins.

Technical Services

Consulting, measurements and training

From field diagnostics to team training: technical consulting, Class A measurements, lectures and in-company courses.

Technical Articles

Reference technical content

Articles by the Dicel team on harmonics, filters, capacitors and technological evolution in electrical disturbances.

Clients

Companies that trust Dicel

We serve industries across sectors — from food and petrochemicals to metals and airports — in Brazil, Argentina and Paraguay.

Wirtgen GroupFockinkMaxiforjaPacifilPMITodeschiniUsimontecWEGBRFFraportNeugebauerWirtgen GroupFockinkMaxiforjaPacifilPMITodeschiniUsimontecWEGBRFFraportNeugebauer

Request a quote or facility assessment

Full form on the contact page — or reach us directly on WhatsApp.

Go to Contact